Behari Lal Engineering IPO

Live Mainboard
Apply now

Already have an account? Apply now

Behari Lal Engineering IPO details

12th – 14th Aug 2026
19 Aug 2026
₹271 – ₹285
Lot size 52 — ₹14820
302cr

Schedule of Behari Lal Engineering

Issue open date 12 Aug 2026
Issue close date 14 Aug 2026
UPI mandate deadline 14 Aug 2026 (5 PM)
Allotment finalization 17 Aug 2026
Refund initiation 18 Aug 2026
Share credit 18 Aug 2026
Listing date 19 Aug 2026
Mandate end date 29 Aug 2026
Lock-in end date for anchor investors (50%) 15 Sep 2026
Lock-in end date for anchor investors (remaining) 14 Nov 2026

Note: The schedule is tentative. The anchor lock-in period ends 30 days after the actual allotment date for 50% of the shares and 90 days after for the remaining portion. The allotment status can be checked on the registrar's website and the exchange website.

About Behari Lal Engineering

Behari Lal Engineering Limited is an integrated steel manufacturing and trading enterprise specializing in customized iron and steel products for various engineering applications. The company’s core business involves manufacturing and selling a diverse range of items tailored to customer-specific requirements, establishing it as one of India’s leading integrated foundries. Its operations are conducted through integrated facilities in Punjab, including a Steel Melt Shop, Foundry, and Rolling Mill divisions. Key products include forging ingots and forged shafts, metal rolls, engineering castings, and alloy steel products such as flats, rounds, and squares. The company generates revenue primarily through the domestic and export sale of these products, supplemented by income from job work services. This model allows it to serve a broad range of industrial clients with high-quality, specialized steel solutions.


Financials of Behari Lal Engineering


Issue size

Funds Raised in the IPO Amount
Total issue size 301.62
Fresh Issue – Proceeds go to the company 93
Offer for sale – Proceeds go to the existing investors 208.62

Utilisation of proceeds

Purpose INR crores (%)
New equipment and civil work at Manufacturing Facility 1
19.59 (21.06%)
New rooftop solar panels at Manufacturing Facility 1 3.4 (3.66%)
New equipment and civil work at Manufacturing Facility 2 36.65 (39.41%)
New rooftop solar panels at Manufacturing Facility 2 3.4 (3.66%)
Repayment/prepayment of borrowings 0.57 (0.61%)
General corporate purposes 29.39 (31.6%)

Strengths

  • Strategic location in a major steel hub provides seamless access to key raw materials and logistics infrastructure.
  • The scale of operations as a large-scale manufacturer of metal rolls offers competitive advantages and cost efficiencies.
  • A multi-decade legacy in the steel casting and foundry sector creates a high entry barrier for new competitors.
  • Integrated manufacturing facilities with steel melt shop, foundry, and rolling mill divisions under one system.
  • Diversified product portfolio with customized forging ingots, forged shafts, metal rolls, and engineering castings.

Risks

  • Complete operational dependence on facilities based out of a single geographic location in Punjab.
  • Heavy reliance on a limited number of top clients for a majority of total business revenue.
  • Vulnerability to fluctuations in prices of essential raw materials like steel scrap, pig iron, and alloys.
  • Substantial working capital requirements to maintain inventory levels and manage credit cycles.
  • Exposed to regulatory compliance risks and stringent environmental safety mandates for foundry operations

Allotment Status for Behari Lal Engineering

To check your IPO allotment status:

  • Visit the MUFG Intime India IPO Application Status page.
  • Select the company name from the dropdown menu.
  • Select and enter one of the following: PAN, Application Number, DP/Client ID, or Account Number/IFSC.
  • Click Submit to view your allotment status.